Connect the affected records
Explore the relationships that may carry the impact of a change.
Atlas. Model a proposed change, inspect its assumptions, and compare scenarios before deciding what to do.

Product walkthrough. Press Space or Enter to pause or play.
Explore the relationships that may carry the impact of a change.
Change an assumption or response and examine the resulting scenarios.
Keep the inputs, assumptions, and unresolved questions beside the projected result.
A carrier failure affects 42 shipments. Follow the connections, compare fallback capacity, and inspect the proposed response.
Find Horizon Freight and its shipments and lanes. The risk filter selects the same 17 high-risk shipments in the graph and table.
Inspect the fixed inputs and fallback capacity behind the scenario. Its projected service result assumes required future approvals; three lithium holds remain.
Open the linked Task for 14 eligible reroutes. The operator can review the exact proposal; the Atlas comparison itself has not moved a shipment.

In practice
An available capacity slot is only one part of a feasible recovery. Atlas connects the carrier, shipments, and lanes, then shows a scenario beside its baseline. The team can inspect the assumptions before taking the eligible reroutes into the operating approval.
Explore the solutionBring a proposed change and the assumptions behind it. We’ll discuss how to compare its possible impacts.