Documents: source passage to review 00:00:00.000 — Read the operating requirement The port bulletin requires current telemetry and shipment-specific compliance approval before tendering a lithium load. 00:00:10.043 — Inspect the outstanding finding The publication-timing finding remains pending review. An extracted statement is separate from an accepted operating change. 00:00:20.131 — Keep the source with the review The source wording and document version remain available beside the finding. No review is submitted in this walkthrough.